Project Description
In 2017, a design and build contract to convert an old House of Fraser outlet in the Highcross Shopping Centre into eight new retail outlets commenced.
The scaffold contract comprised of a heavy duty gantry designed and built to protect the movement of a MEWPs and support an independent scaffold. The design included adequate clearance below to allow demolition to be carried out unimpeded by the scaffold structure. LT ensured that the scaffold dismantle was carried out with the utmost level of care to prevent accidental damage to the new glazing and screen wall installed by the client.